Renewable Energy Projects

  • Vargas Island

    Vargas Island

    Summer of 2018, MEC installed a 10KW completely off-grid photo-voltaic system on the remote location of Vargas Island. In the absence of utility power on the island, the MEC system enabled Cedar Coast Field Station to operate 100% without the use of their diesel generator.

  • Barrs Mtn Water Tower

    Barrs Mtn Water Tower

    This project was a small but very critical for the town of Tofino. We installed a solar system which was required to run the level / control system for which the Districts water system relied on. as well as providing communications from water towers to plants.

  • TOFINO RADIO

    Tofino Radio

    Complete in winter of 2018, MEC Projects was happy to assist Tuff City Radio in going 100% off the grid. We designed and installed a solar system set up that gave the West Coasts favourite radio station total independence.

  • Pacific Rim National Park – Cheewhat Cabin Solar Upgrades

    Pacific Rim National Park – Cheewhat Cabin Solar Upgrades

    In 2020, MEC Projects completed the electrical solar design and upgrades to the remote Cheewhat cabin for Parks Canada.

Top